Preassembled Log Homes Serving the West Coast and Pacific Rim
Standard Log Home Package
Homestead Log Homes Standard Package includes the materials you need to build the home to a decked shell stage of completion. Your logs are meticulously air dried, hand peeled, and assembled with lag screw and through-bolt construction. The floor plan is designed to present a beautiful aesthetic indoors and out, as well as a comfortable living space. Whichever log cabin package model you choose, count on superior quality in every component. Pre-assembly at the factory saves time and money, and the three days of on-site supervision by our trained professionals assures a smooth assembly and build-out. Please review the list of materials below, and click on the image to see an enlarged view of the schematic. Note the list of Options Available to customize the package and make it your own log home design.
Wall logs, 10-12″ average diameter, pre-assembled, sanded and treated
Log roof rafters
Log dormer rafters
Log dormer posts
Log dormer headers
Ridge-beams
Ridge-beam plates
Log second floor joists and hangers
Second floor girders
Log ridge support posts
Log gable support posts
Frieze blocking
Interior log staircase with log treads
Log porch header, porch rafters and porch posts
Log rim joists
Posts and railings for the loft, interior staircase, deck and porch
Log siding and corner posts for gable ends and dormers
2″x 6″ kiln dried T&G pine decking for the roof, 2nd floor and porch roof
AND:
Penetreat (a borate based solution that is a mild insecticide, mildecide and fungicide)
5 sets of complete working drawings
Construction Manual
Log rafter strap ties
(½”X 10″) and (½” X 8″) and (½” X 3″) lagscrews and washers
12″ Log Hog log wall fasteners
¾” solid steel throughbolts, nuts and plates
Steel log floor joist hangers
Steel beam hangers
Steel screwjacks
Angle iron
Closed cell log wall gasket material
1 case of Log Builder caulking per 1,000 sq. ft. of home size (additional caulking for finish work will be available at a 10% discount for an additional fee)
Construction adhesive
3 days of supervision as specified on the log specifications sheet